Finally got the bike ready for a shakedown run.
The box for the controller is physically rather larger than I hoped, yet was quite tight to get everything in - hence the loop of cable strapped to the frame. About three and a half miles of spiral wrap later:
Battery is from my Ezee kit thats on the Carrera, it's mounted on a strip of din rail bolted to the rack.
Motor is well seated into the dropouts with tab washers, no torque bracket as yet.
Haven't been able to get the tyre to seat concentricly, tried three times now, letting the tyre down and trying to manipulate the walls into place. But it's still wobbly, have to see how it feels.
Wiring for pas and control buttons had to be extended, throttle was long enough.
Now I need to get round to cutting the grass !
Don't know about the P settings, motor magnet count - what's that ? I'll see what the first ride gives me.