Quite easy you select the textMmmhhh. I appear to have got rid of the unwanted Italics now !
Select the text first, then the style for that text; use ctrl-A to select all the text. Also note the shortcuts (shown when you hover on the style bar) such as ctrl-I for italic on/off.Quite easy you select the textSTYLEfrom the header bar in the post reply box.
Do you know how the situation is regarding the lead time of the Wayfarer IwanEllis?I've been going round the houses looking for a robust, comfortable high torque bike with a throttle and the Wayfarer is the only option that ticks all boxes and still looks great. Ordered in April but again, not likley to see it until July.
David from Whisper has been brilliant, even though I'm sure this delay is just as frustrating for him, and it's the customer service above all that has made me sticknwith the Wayfarer (blue, rear hub adventure with the biggest battery) , just wish it was here now.
I was told when I ordered 6 to 8 weeks, put my order in but they are really fair and wouldn't take any money until they could give me a date for delivery. They then contacted and said it will be at least June, now possibly July.Do you know how the situation is regarding the lead time of the Wayfarer IwanEllis?
Hi David, can you tell how many Nm the mid-drive bikes are please and have you any demo bikes in the Northwest? Cheers.Hi Guys, that's incorrect unfortunately. The frames are going onto a container today and will be in Portugal in 6 weeks so they will be ready at the end of July, we only have 250 being built and they are all but sold. Two weeks later another 250 will be available and so on for the rest of the season so we will be in stock but if the bikes are not on order now I would expect mid to late August.
We also have the new Wayfarer Sport range being prototyped so everying is very busy.
All the best, David
End of July. Gutted, that's a huge delay from April/May.Hi Guys, that's incorrect unfortunately. The frames are going onto a container today and will be in Portugal in 6 weeks so they will be ready at the end of July, we only have 250 being built and they are all but sold. Two weeks later another 250 will be available and so on for the rest of the season so we will be in stock but if the bikes are not on order now I would expect mid to late August.
We also have the new Wayfarer Sport range being prototyped so everying is very busy.
All the best, David
It is Iwan, we've been hit with the supply chain collapse due to COVID followed by issues with the frames that were unexpected. We have had to make some minor frame design adjustments to ensure we pass the very rigorous stress tests and the paint application was a nightmare. As there are some larger areas than on a normal bike and we are seeing both large areas of extruded and molded aluminium sections welded together on the same frame the paint was not taking well or it was running. We have had to apply the paint more like on a new car to avoid this, so we now paint in six thinner coats rather than three thicker. The finish of course is amazing, though expensive! We felt it was better to get all the niggles out of the way before we launched.End of July. Gutted, that's a huge delay from April/May.
I've sent you an email regarding the stems and is there a difference in the 3 variations. As I haven't been able to test the bike I wondered if a variable stem on the Adventure would give me more flexibility on reach fit. Been burnt by ordering a Ridgeback cyclone on leg length only and wanted to avoid agon!
As always, huge thanks and respect for your customer service in all of this. Even though, the wait is excruciating, the service has always been excellent.
Thanks David, will Swinnertons also be stocking them? that is where I got my 905.Nearest to Cheshire is...
Cars N BikesCars N Bikes67 Main StFrodsham WA6 7DF
Phone: 01928 731575
10.4 miDirections
All the best, David
Yep!Thanks David, will Swinnertons also be stocking them? that is where I got my 905.
Thanks David, I'm sure you would have preferred to have got them flowing through too!It is Iwan, we've been hit with the supply chain collapse due to COVID followed by issues with the frames that were unexpected. We have had to make some minor frame design adjustments to ensure we pass the very rigorous stress tests and the paint application was a nightmare. As there are some larger areas than on a normal bike and we are seeing both large areas of extruded and molded aluminium sections welded together on the same frame the paint was not taking well or it was running. We have had to apply the paint more like on a new car to avoid this, so we now paint in six thinner coats rather than three thicker. The finish of course is amazing, though expensive! We felt it was better to get all the niggles out of the way before we launched.
We also had a few issues with the 100Nm of power when linked to a throttle on the mid motor, a minor issue but important. We have worked hard on the motor mapping but we have sorted it out.
Sorry for the delay, but I assure you it will be worth the wait!
All the best, David