As per the title, the build though may take a while as I am quite busy.
The tower scaffold has already been up and down twice and will be so a few times more this year and the bees are needing my attention alone without other distractions. The rubbish is building up as well due to the council tips being closed.
I have got hold of a Cotic small frame from an all steel Roadrat.
The forks are of no use as the calliper fitting is LHS.
The front derailleur is new old stock and picked it up off ebay for £5, I plan on going double up front for the Alfine as I did on the Kona Blast.
Head set badge nice.
As the forks are not of use I will replace them with a new steel set by Surly along with On One Mike swept bars, a bargain for about £12.
My first couple of jobs though will be to lace/build and true the Alfine 8 and G370 in to new 700c rims. Sokes will be my favoured ones Sapim Strong's 14g procured from the excellent services of Spokes From Ryan.
The tower scaffold has already been up and down twice and will be so a few times more this year and the bees are needing my attention alone without other distractions. The rubbish is building up as well due to the council tips being closed.
I have got hold of a Cotic small frame from an all steel Roadrat.
The forks are of no use as the calliper fitting is LHS.
The front derailleur is new old stock and picked it up off ebay for £5, I plan on going double up front for the Alfine as I did on the Kona Blast.
Head set badge nice.
As the forks are not of use I will replace them with a new steel set by Surly along with On One Mike swept bars, a bargain for about £12.
My first couple of jobs though will be to lace/build and true the Alfine 8 and G370 in to new 700c rims. Sokes will be my favoured ones Sapim Strong's 14g procured from the excellent services of Spokes From Ryan.
Last edited: